logo

Z2Da--Fy26: Nrm (Proj: 516-25-610) Bb - Upgrade Fire Pumps, Install Wet Pipe Systems, & Replace Various Sprinkler Heads

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Presolicitation

03/06/2026 Solicitation Posted Site Visit 03/12/26 at 9:00 AM EST RFIs Due 03/16/26 at 10:00 AM EST Proposals Due 03/31/26 at 10:00 AM PROJECT TITLE: Bid Build (BB) Upgrade Fire Pumps, Install Wet Pipe Systems, & Replace Various Sprinkler Heads, Project No. 516-25-610 CONTRACT TYPE: Bid Build (BB), Firm Fixed Price PROJECT SUMMARY: The contractor shall provide all labor, tools, and materials neces

Status
Closed
Sector
Hospital, Commercial, Residential
Location
Bay Pines, Florida, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Z2Da--Fy26: Nrm (Proj: 516-25-610) Bb - Upgrade Fire Pumps, Install Wet Pipe Systems, & Replace Various Sprinkler Heads

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Z2Da--Fy26: Nrm (Proj: 516-25-610) Bb - Upgrade Fire Pumps, Install Wet Pipe Systems, & Replace Various Sprinkler Heads” is a tender record in Taiyo, linked to the Hospital sector. It is issued for works, goods, or services related to Bay Pines, Florida, United States of America.

Participants

Not available for this record.

Status

Original status

presolicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

03/06/2026 Solicitation Posted Site Visit 03/12/26 at 9:00 AM EST RFIs Due 03/16/26 at 10:00 AM EST Proposals Due 03/31/26 at 10:00 AM PROJECT TITLE: Bid Build (BB) Upgrade Fire Pumps, Install Wet Pipe Systems, & Replace Various Sprinkler Heads, Project No. 516-25-610 CONTRACT TYPE: Bid Build (BB), Firm Fixed Price PROJECT SUMMARY: The contractor shall provide all labor, tools, and materials necessary for the following work: Bid-Build project to replace obsolete fire pump in building 103 and program controls to ensure proper operation of the pumps. Add fire sprinkler system to building 35 (there is no system currently in building 35) and the auditorium of building 20. Upgrade fire sprinkler system in buildings 2 and 37. Project is located at the C.W. Bill Young VA Medical Center, 10000 Bay Pines Boulevard, Bay Pines, FL 33744 Period of performance is 270 days. MAGNITUDE OF CONSTRUCTION: Between $2,000,000 and $5,000,000 OFFICE ISSUING THIS REQUEST: Department of Veterans Affairs Network Contracting Office (NCO) 8 Point of Contact: Stacy Figlinski, Contracting Officer Email: Stacy.Figlinski@va.gov The Solicitation for this project will be issued on or about March 4, 2026. This project is 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).

Original sector

Construction

Location

Country

United States of America (USA)

State

Florida

City

Bay Pines

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Hospital, Commercial, Residential

Article published date

2026-03-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender